Case study on optimization of mold adhesion and surface pores of precast concrete components: stable demoulding within two weeks and reduced frequency of mold cleaning
Precast concrete components (standard parts for wall panels and beams and columns)
Through process consistency control and collaborative optimization of the demoulding system, defects were significantly reduced and the mold cleaning cycle was extended during the two-week trial production.